Project officer
06-2014 - 09-2015 Chemistry / Biology / Agronomy Officer of the project:
- Constructed of a food processing factory
- Established two new production lines (capacity of production: 1.2 t/h respectively)
- Relocated the old production lines (15 km between two factories)
Engineering Internship 06/2014-08/2014
- Verified the conformity of the new factory with the requirements and technical
specifications of the machines
- Participated in the rough goods receipt of the new machines at the manufacturer’s
factory
- Identified potentiel problems and tracked the modifications
Fixed-term Contract 09/2014-01/2015
- Monitored and verified the installation of 2 new production lines
- Organized workforce, and coordinated between different service suppliers
- Verified outsourced maintenance tasks
Professionalization Contract 02/2015-12/2015
- Tracked and reported the usage of the 2 new production lines
- Claimed problems to suppliers, and responsible for solution realization
- Improved the performance of the production lines
- Trained operator, and monitored the working performance
- Modified the operation and maintenance SOP